Herunterladen Inhalt Inhalt Diese Seite drucken

Schüco IPE 030 CN 05 Kurzanleitung Seite 66

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 8
Installation
Installation
15/20
62
1 DC Load Break Switch
DANGER
Extreme danger from electric shock!
x Touching live parts can result in death.
x All electrical work must be carried out by a qualified electrician while observing
the VDE regulations, national and other regulations.
x Ensure that the cables are installed securely.
NOTE
x Any kind of soiling (dust, moisture, etc.) has a negative effect on the terminals
with regard to function over the intended period of use.
x We recommend DC connection cables with cross sections of between
16 mm² and 70 mm².
x The copper cables must be double-insulated and UV-resistant, as those provided
by Schüco.
The following sequence must be observed during assembly:
1.
Strip the voltage-free line.
x with end splice 15 mm
x without end splice 20 mm
The screw terminals are fully suited copper cables from 16 mm² to 70 mm². The
screws to the terminal blocks must be tightened with a torque of 6-8 Nm. The
use of aluminium cables is only possible for cross sections of 35 mm² - 70 mm².
Please observe the specifications of the cable/cable socket manufacturer (re-
moval of oxide layer, use of Vaseline or grease)
CAUTION
Please avoid squeezing the cable insulation or the end splice. Improper connection
may damage the equipment!
2 Solar generator connection
IPE 030 - 033 CN 05