Installation
Installation
64
1 AC connection
The unit is centrally earthed using PE terminals. No separate earthing of the solar
generator is required.
A corresponding circuit breaker is recommended as a line protection element in the
grid feed direction:
3 x 63 A with slow-blow characteristic C
(with connection cross-sections • 16 mm
A three-pin circuit breaker or individual fuses can be used. Protection is implemented
according to the installation method. A guide is provided in the appendix.
An all-pole AFI safety switch Type B must be installed between the mains fuse and
the inverter.
The AC power distribution incl. mains fuse should be placed as close as possible to
the inverter.
PE N L3 L2 L1
NOTE
x A three-phase meter must be used.
x Some grid operators require the use of a reverse-current-capable meter.
DANGER
Extreme danger from electric shock!
x Touching live parts can result in death.
2 DC Load Break Switch
2
)
Mains fuse
2
3
4
1
IPE 030 - 033 CN 05