Herunterladen Inhalt Inhalt Diese Seite drucken

Inserting The Cable Tie Reel; Commissioning Before Every Use; Check Before Operation; Check After Operation - HallermannTyton AT2000 CPK Betriebsanleitung

Vorschau ausblenden Andere Handbücher für AT2000 CPK:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5 .8 Inserting the cable tie reel

5
4
Inserting the cable tie reel
1 Cable tie reel
2 Reel retainer
3 Clamp ring
4 Guide roller
5 Band chain
1 Pull the clamp ring
off of the reel retainer
3
2 Push the cable tie reel
f Make sure that the cable tie reel
clockwise.
3 Put the clamp ring
onto the reel retainer
3
4 Guide the band chain
5
the tool.
f Make sure that the band chain
; The cable tie reel is inserted.
Operating Instructions • Overhead Suspension AT2000 CPK • 03/2020 • 106-29021
.
2
onto the reel retainer
.
1
2
can be unwound
1
.
2
over the guide roller
to
4
is not twisted.
5
Installation and initial operation

5 .9 Commissioning before every use

Commissioning before every use is important for
safety and comprises a check before and after
operation.
f Check the overhead suspension for defects.
f Have any defects found repaired by maintenance
personnel if necessary.
f Only operate the overhead suspension when all
defects have been repaired and safety is ensured.
1

5 .9 .1 Check before operation

2
Before every operation, perform the following steps:
f Check the power cable and the connection cable for
3
firm seating.
f Check the unwinding direction of the cable tie reel.
f Check the function of the balancer.

5 .9 .2 Check after operation

After every operation, perform the following steps:
f Clean the overhead suspension, the tool, and the
surrounding workplace.
f Record and report any observed defects.
11

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis