5 .6 Installing the power supply unit with control
box
The following installation steps also apply for standard
power supply units without control box.
5
4
3

Installing the power supply unit with control box

1 Fixing screws (power supply unit bracket)
2 Power supply unit with control box
3 Holes for power supply unit
4 Power supply unit bracket
5 Holes for power supply unit bracket
1 Loosen and remove the four fixing screws
(power supply unit bracket)
2 Install the power supply unit with control box
f Push the power supply unit with control box
the power supply unit bracket
f Make sure that the four holes
unit with control box
2
the power supply unit bracket
f Insert the four fixing screws (power supply unit
bracket)
through the holes and tighten by hand.
1
; The power supply unit with control box is installed.
Operating Instructions • Overhead Suspension AT2000 CPK • 03/2020 • 106-29021
.
1
.
2
over
2
from below.
4
on the power supply
3
are flush with the holes
5
.
4
Installation and initial operation

5 .7 Connecting the CPK power supply unit

8
7
6
1
5
2
4
Connecting the CPK power supply unit
1 Balancer (cable pull)
2 Clips (balancer)
3 Spacer
4 Connection cable
5 Power supply unit
6 Power cable
7 Clips (column)
8 Column
1 Connect the power cable
unit
.
5
2 Fasten the power cable
the clips
.
7
f Make sure that the power cable is routed without
kinks
.
6
3 Connect the tool to the power supply unit
the connection cable
on
f Observe the operating instructions for the
Autotool 2000 CPK.
4 Clamp the connection cable
the power supply unit bracket and fasten it along the
balancer (cable pull)
f Make sure that the connection cable
without kinks.
The connection cable between the tool and the power
supply unit with control box must be fastened loosely on
the balancer to be able to compensate for possible
movements.
; The tool and the power supply unit are connected.
3
to the power supply
6
along the column
using
6
8
with
5
.
4
onto the spacer
4
using the clips
.
1
2
is routed
4
1
2
of
3
10