Mounting
HOT LIQUID
Water in heating systems is under high pressure and can have temperatures of
more than 100 °C.
Verify that the heating water has cooled down before mounting the product.
Failure to follow these instructions can result in death, serious injury or
equipment damage.
5.1
Preparing mounting
 Verify that the pump does not influence the position of the float in the prod-
uct (for example, strong flow or suction effects).
 Verify that no shut-off fitting is mounted for the product.
 Verify that the probe body is removed before welding work is performed.
5.2
Mounting the product
The product must be installed vertically.
1. Before performing welding work, remove the welding sockets from the
probe.
2. Install the product into a vertical section of the flow line.
3. Install the product in the boiler circuit upstream of the mixer.
- The switch-off level of the product must be at least 100 mm above the
highest heated surface of the heat generator.
Mounting
WARNING
WMS-WP6
EN
14