Herunterladen Inhalt Inhalt Diese Seite drucken

AFRISO WMS-WP6 Betriebsanleitung Seite 43

Vorschau ausblenden Andere Handbücher für WMS-WP6:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
6
Commissioning
6.1
Commissioning the product
Product with locking:
1. Press the "Unlock" pushbutton after you have filled and vented the heating
system.
- The burner is released.
Product without locking:
The burner is automatically released by the product after filling and venting.
If a locking unit is required, it must be provided on site.
6.2
Performing the function test
You can perform the function test without lowering the water level.
1. Press the test unit.
- The burner switches off.
Product with locking:
2. Press the unlock pushbutton to release the burner.
Product without locking:
After you release the test unit, the product automatically releases the burner.
6.3
Operation
If the water level is too low, the product interrupts the power supply to the
burner.
Product with locking:
Remove the cause and press the unlock pushbutton.
Product without locking:
After you have removed the cause, the product unlocks automatically.
Commissioning
WMS-WP6
EN
18

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis