Herunterladen Diese Seite drucken

Commissioning / Electrical Connections - Grundfos Conex DIA-2 Installationsanleitung

Instrument amplifier and controller
Vorschau ausblenden Andere Handbücher für Conex DIA-2:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 54
10. Commissioning / electrical
connections
Warning
Switch off the power supply before
installing!
Enclosure class IP65 is only guaranteed with
the front panel of the terminals enclosure
closed and with appropriate cable glands or
dummy caps.
Warning
Switch off the power supply before
connecting the power supply cable and
relay contacts! For safety reasons, the
protective conductor must be connected
correctly!
Observe the local safety regulations!
Protect the cable connections and plugs
from corrosion and moisture.
Before connecting the power supply cable,
check that the supply voltage specified on
the nameplate corresponds to the local
conditions!
An incorrect supply voltage may destroy
the device!
To guarantee electromagnetic compatibility
Caution
(EMC), the input and current output cables
must be screened.
Connect the screening to the screen
ground on one side.
Refer to the wiring diagram! Route the
input, current output and power supply
cables in separate cable channels.
Enclosure class IP65 is only guaranteed if
the terminal cover is correctly sealed! Do
not damage the gasket on the terminal
cover!
Caution
The gasket on the terminal cover must be
positioned precisely!
Do not damage the gasket!
Note
Unused terminals must remain open.
1. Remove the terminal cover on the front of the
device.
2. Use the appropriate cable feedthroughs and
tighten the screws carefully.
3. Connect the cables used to the terminals
according to the Conex
assignment.
4. Close the terminal cover again with correctly
positioned gasket.
®
DIA-2 terminal
17

Werbung

loading