Herunterladen Inhalt Inhalt Diese Seite drucken

Eco / 15.0 - Fronius Eco Installationsanleitung

Vorschau ausblenden Andere Handbücher für Eco:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation State
Installing State 112 KIT:
112 KIT

Eco / 15.0

(6)
(1)
(1)
(1)
(1)
(2)
(3)
(6)
(5)
(4)
WARNING! Observe the safety
rules (see the beginning of the
"Safety" section)
Take the inverter out of the mounting
1
bracket and open it (see "Opening and
closing the device")
Remove 4 screws 5x10 TX25 (1)
2
Guide cable (2) of the "State 112 KIT"
3
through this hole of the EMC cage (6)
WARNING! Insert cable and en-
sure that the additional insulation
(3) is positioned in the hole in or-
der to avoid damage to the KIT ca-
ble
Use enclosed cable ties (5) to secure
4
State 112 KIT (4) to the EMC cage (6)
Use diagonal cutting pliers to remove
5
excess length of the cable ties
47

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Symo

Inhaltsverzeichnis