The electrician who carried out the inspections is responsible for documenting them
correctly
All inspections carried out are to be documented in an inspection log. The measured
values as well as the inspection equipment used, and calibration data must be given.
If an individual inspection cannot be carried out, reasons for the inspector's decision
are to be documented.
If the inspection is not passed, then the device in question must be clearly identified
as unsafe and the operator must be informed. The equipment must no longer be op-
erated.