Herunterladen Inhalt Inhalt Diese Seite drucken

Fronius Eco Installationsanleitung Seite 48

Vorschau ausblenden Andere Handbücher für Eco:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

48
4
2
3
1
(8)
(9)
(10)
Secure cable of the "State 112 KIT" (7)
6
and the AC cable (8) to the power sta-
ge set (9) again using 4 screws 5x10
TX25 (10) [3.5 Nm]
Blue cable of the KIT and AC line with
7
number 4 at position 4
Any black cable of the KIT and AC line
8
(7)
with number 3 at position 3
Any black cable of the KIT and AC line
9
with number 2 at position 2
Any black cable of the KIT and AC line
10
with number 1 at position 1
Screw order:
-
Screw 5x10 TX25
-
Cable lug of the State 112 KIT
-
Cable lug of the AC line
-
PC board
Close the inverter and place it in the
11
mounting bracket (see "Opening and
closing the device")
WARNING! Observe the positions
of the cables as well as the screw
order!

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Symo

Inhaltsverzeichnis