Herunterladen Inhalt Inhalt Diese Seite drucken

Upright TM12 Betriebsanleitung Seite 5

Vorschau ausblenden Andere Handbücher für TM12:
Inhaltsverzeichnis

Werbung

TM12 Hydraulic Schematic - 065415-001
ENGLISH
FRANCAIS
1.
Valve
Vanne
2.
Relief valve
Clapet de décharge
3.
Cylinder
Vérin
4.
Motor
Moteur
5.
Orifice
Orifice
6.
Check valve
Clapet de non-retour
7.
Brake
Frein
8.
Pump
Pompe
9.
Filter
Filtre
10.
System valve block
Groupe de vannes
du système
11.
Lift cylinder valve block
Groupe de vanne
du vérin de relevage
Downloaded from
www.Manualslib.com
GERMAN
SPANISH
Ventil
Válvula
Überdruckventil
Válvula de alivio
Zylinder
Cilindro
Motor
Motor
Drosselblende
Orificio
Rückschlagventil
Válvula de retención
Bremse
Freno
Pumpe
Bomba
Filter
Filtro
Systemventilblock
Bloque de válvula
del sistema
Hubzylinder-Ventilblock
Bloque de válvula del
cilindro de elevación
28
manuals search engine
Parking Brake Release (Figure 4)
Perform the following only when the machine will
not operate under its own power and it is neces-
sary to move the machine or when towing the
machine up a grade or winching onto a trailer to
transport.
1. Remove the spring compression nut so the
spring is loose and the Brake Bars are away
from the tyres.
2. The machine will now roll when pushed or
pulled.
After moving the machine and before normal
operation:
Replace the spring compression nut and tighten
until the spring measures 24.8-25.4 cm (9¾-10 in.)
in length, verify that the Brake Bars have fully
engaged the tyres before the machine is operated.
Never operate work platform with the
Parking Brakes released. Serious injury or
damage could result.
Never tow faster than .3m/sec. (1 ft./sec.).
248-254 mm
(9
3
/
-10 in)
4
Spring
Compression Nut
Figure 4: Parking Brake Adjustment
Transporting Work Platform
By Forklift
NOTE: Forklifting is for transporting only.
See specifications for weight of work
platform and be certain that forklift is of
adequate capacity to lift platform.
Forklift from side by lifting under the Chassis
(Figure 5).
By Crane
Secure straps to chassis lifting/tie down points only
(Figure 5).
When attaching straps or chains to the
right rear tie down/lift point be careful not to
damage the Brake Cylinder or hose.
By Truck
1. Manoeuvre the work platform into transport
position and chock wheels.
2. Secure the work platform to the transport
vehicle with chains or straps of adequate load
capacity attached to the chassis lifting/tie down
points (Figure 5).
When attaching straps or chains to the
right rear tie down/lift point be careful not to
damage the Brake Cylinder or hose.
Overtightening of chains or straps attached
to tie down lugs may result in damage to
work platform.
3. Open the Emergency Lowering Valve.
Forklift
Typical Tie Down/
Lifting Lug
Figure 5: Transporting Work Platform
5

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis