Herunterladen Inhalt Inhalt Diese Seite drucken

Upright TM12 Betriebsanleitung Seite 3

Vorschau ausblenden Andere Handbücher für TM12:
Inhaltsverzeichnis

Werbung

NOTES:
Downloaded from
www.Manualslib.com
30
manuals search engine
Introduction
This manual covers all models of the TM12 Work
Platforms. This manual must be stored on the
machine at all times.
Pre-Operation and Safety
Inspection
Read, understand and follow all safety rules
and operating instructions and then perform
the following steps each day before use.
1. Open modules and inspect for damage, oil
leaks or missing parts.
2. Check the level of the hydraulic oil with the platform
fully lowered. Open the Left Module and remove the
reservoir cap, oil should be visible on the dipstick.
Add ISO #46 hydraulic oil if necessary.
3. Check that fluid level in the batteries is correct
(See Battery Maintenance, Page 6).
4. Verify batteries are charged.
5. Check that A.C. extension cord has been
disconnected from chassis outlet.
6. Check that all guardrails are in place and all
fasteners are properly tightened.
7. Carefully inspect the entire work platform for dam-
age such as cracked welds or structural members,
loose or missing parts, oil leaks, damaged cables or
hoses, loose connections and tire damage.
8. Move machine, if necessary, to unobstructed
area to allow for full elevation.
9. Turn Chassis and Platform Emergency Stop
Switches ON (Figure 1 & 2) by pulling the button
out.
10. Turn the Chassis Key Switch (Figure 1) to
CHASSIS.
11. Push Chassis Lift Switch (Figure 1) to UP
position and fully elevate platform.
12. Visually inspect the mast assembly for damage
or erratic operation. Check for missing or loose
parts.
13. Check Level Sensor (Figure 3) operation by
pushing the sensor off of level while pushing
the Chassis Lift Switch to UP position, the
Chassis
Emergency
Stop Switch
Chassis Lift
Switch
Key Switch
Figure 1: Chassis, Left Side
alarm should sound.
14. Partially lower the platform by pushing Chassis
Lift Switch to DOWN, and check operation of
the audible lowering alarm.
15. Open the Chassis Emergency Lowering Valve
(Figure 3) to check for proper operation by
pushing in on the knob and turning ¼ turn
counterclockwise. Once the platform is fully
lowered, close the valve by pushing in and
turning the knob ¼ turn clockwise until the
detent engages.
16. Turn the Chassis Key Switch to DECK.
17. Close and latch module doors.
18. Check that route is clear of persons, obstruc-
tions, holes and drop-offs, level and capable of
supporting the wheel loads.
19. After mounting platform secure bar across
entrance.
20. Pull Emergency Stop Button out to the ON
position.
21. Position Drive/Lift Switch to DRIVE.
22. While depressing the Foot Switch, slowly
position the Control Lever to FORWARD then
REVERSE to check for speed and directional
control. The farther you push or pull the Con-
trol Lever from centre the faster the machine
will travel.
23. Push Steering Switch RIGHT then LEFT to
check for steering control.
24. Push the Emergency Stop Switch Button.
25. With only one Emergency Stop Button pushed
down, in the OFF position, operate a control to
verify that the Emergency Stop Switch is
functioning. Repeat the test with only the other
Emergency Stop Switch Button OFF. If any
function operates with either Emergency Stop
Switch in the OFF position STOP and remove
the machine from service until it is repaired.
Steering
Switch
Control Lever
Emergency
Stop Switch
Drive/Lift
Switch
Figure 2: Controller
3

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis