Herunterladen Inhalt Inhalt Diese Seite drucken

ECOFOREST ecoSMART e-manager Installerhandbuch Seite 34

Vorschau ausblenden Andere Handbücher für ecoSMART e-manager:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

The pLAN port is reserved for communication with the pump or heat pumps of the ecoGEO, ecoGEO HP and ecoAIR range. The
connection between the heat pump and the e-manager will be carried out as shown in the figure.
CHiNT
NH4-2-32
POWER
SUPPLY
J10 FBUS1
J11 BMS2
J14 pLAN
J15
pCOOEM+
8
7
6
5
J1
J2
J3
24 Vac
FBus
BMS2
pLAN
Figure 2.7. Example of pLAN connection with the heat pump controller.
Before any configuration make sure that the pLAN connector is disconnected. Failure to disconnect the pLAN cable prior to
configuration may result in installation malfunction and / or damage to the heat pump components.
NOTE
Disconnect the pLAN cable if you need to update the e-Manager or the heat pump software.
In addition to the connection of these devices, the e-manager incorporates a BMS2 PORT that allows communication with external
devices as a slave of a Modbus network. This port is free and its connection is not necessary for the correct functioning of the
system. In case you want to connect an external device to your ecoSMART e-manager, contact Ecoforest technical support before.
NC
COM
NO
COIL
J16
J17
J18
J19
J20
J21
J22
J23
J24
J27
J28
J29
J25
J26
J4
J5
J6
J7
DI1
DI2
DI3
DI4
DI5
DI6
Installer manual ecoSMART e-manager
J10 FBUS1
J1
pLAN
34
J16
J17
J18
J19
J20
J21
J22
J11 BMS2
J14 pLAN
J27
J28
J15
pCOOEM+
J25
J26
J2
J3
J4
J5
J6
HEAT PUMP CONTROLER
J23
J24
J29
J7

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis