Herunterladen Inhalt Inhalt Diese Seite drucken

Energy Manager Power Supply - ECOFOREST ecoSMART e-manager Installerhandbuch

Vorschau ausblenden Andere Handbücher für ecoSMART e-manager:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

2.4.

Energy manager power supply

The ecoSMART e-manager power supply requires a single phase power supply L/ N / PE, 230 V / 50 Hz. The recommended section
of the wires for the power supply is 1.5 mm2.
For the electrical installation, bring the power cable to the upper left of the box and route it to the power terminal block as shown
below.
POWER SUPPLY
The e-manager controller is powered by an alternating current at 24V. The electrical box includes a transformer and the
overcurrent protections needed to protect your equipment.
If you are forced to replace any of the protection fuses present in the box, do it with a fuse of the same maximum current value.
NH4-2-32
POWER
SUPPLY
8
7
6
24 Vac
FBus
BMS2
Figure 2.4. ecoSMART e-manager power supply scheme.
31
Installer manual ecoSMART e-manager
CHiNT
J16
J17
J18
J10 FBUS1
J11 BMS2
J14 pLAN
J27
J15
pCOOEM+
J25
5
J1
J2
J3
J4
J5
pLAN
NC
COM
NO
COIL
J19
J20
J21
J22
J23
J24
J28
J29
J26
J6
J7
DI1
DI2
DI3
DI4
DI5
DI6

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis