Herunterladen Inhalt Inhalt Diese Seite drucken

Maintenance; Electrical Installation; E-Manager Unpacking - ECOFOREST ecoSMART e-manager Installerhandbuch

Vorschau ausblenden Andere Handbücher für ecoSMART e-manager:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

1.2.

Maintenance

The ecoSMART equipments do not require specific maintenance after commissioning. The internal controller monitors a large
number of parameters and will produce a warning if any problem arises, in which case we recommend you contact your distributor.
All maintenance work must be performed by an authorised technician. Improper handling of the equipment as a whole can result
in personal injury and/or damage to materials.
DANGER!
Do not spill water or other liquids directly on the device to clean it, as this could cause an electric shock or fire.

2. Electrical installation

Before performing any operation on the electrical panel, disconnect the power supply.
DANGER!
2.1.

e-manager unpacking

Remove the packaging cover from your ecoSMART e-manager. Inside, you will find a box like the one in the figure. Carefully remove
the four M4 allen screws from the front and open it as shown below:
Inside the electrical box, you will find:
-
A CEM-C20 energy meter from CIRCUTOR to monitorize the electrical balance with the grid at the border.
-
A CEM-M-RS485 communication module from CIRCUTOR for connection via Modbus with the e-manager controller.
-
One RJ11 telephone wire to connect the controller with the PGD1 display on the front cover.
-
One plastic bag inside the cable rack with four cable glands: two M20 and two M40.
Perform the electrical installation of CIRCUTOR devices according to the manufacturer's instructions included in the box.
Figure 2.1. Removing the front cover of the e-manager.
28
Installer manual ecoSMART e-manager

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis