4. Getting Started

Note
Before use, ensure you insert the batteries in the
measuring station rst and then in the base station.
4.1 Insert batteries / connect power supply
Measuring station
• Remove the screen protector from the display.
• Open the battery compartment and remove the contact
breaker.
• Then close the battery compartment cover.
Base station
Warning
• Connect the product only to a socket that has been
approved for the device. The socket must be installed
close to the product and must be easily accessible.
• Disconnect the product from the network using the
power button – if this is not available, unplug the
power cord from the socket.
• When using a multi-socket power strip, make sure
that the sum power draw of all the connected devices
does not exceed its maximum throughput rating.
• If you will not be using the product for a long period
of time, disconnect it from mains power.
• Remove the screen protector from the display.
• Connect the power supply unit to the power supply unit
connection socket (G) on the back of the base station.
• Connect the power cable of the weather station to a
properly installed socket.
• Alternatively, open the battery compartment (H), insert
three AA batteries with the correct polarity and close
the battery compartment cover.
4
Note
If the batteries are inserted correctly and you connect
the power supply unit to the station, the base station
will automatically switch to the external power supply.
4.2 Replacing the batteries
Note – Replacing the batteries
• Note that the stations have to be resynchronised each
time after you change the batteries in the measuring
or base station.
• To do this, remove the batteries from the other station
and then reinsert them, or change them as required.
Measuring station
• When the
symbol (18) appears, replace the 2 AA
batteries for the measuring station with 2 new ones.
• Open the battery compartment, remove and properly
dispose of the dead batteries and insert 2 new AA
batteries with the correct polarity. Then close the battery
compartment cover.
Base station
• When the
symbol (25) appears, replace the three AA
batteries for the base station with three new ones.
• Open the battery compartment (H), remove and properly
dispose of the depleted batteries and insert three new AA
batteries with the correct polarity. Then close the battery
compartment cover.

5. Installation

Note – Installation
• We recommend initially placing the base and
measuring stations in the intended locations without
installing them and making all the settings described
in 6. Operation – to do.

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

00186418

Inhaltsverzeichnis