Release the operating button to stop the employment of destination during the oil in and out
hydraulic phase.
The button operation is signalled by a red led placed on the frontal part of the Radio-Control.
9. RE-PRIME OF PUMP
Pumps usually haven't necessity to be primed again. Eventually where a defuse happened follow
these procedures:
A) Take off the pump from the tank, check the oil level and if necessary to add up to the
maximum quantity indicated for the pump model that you are using (see chapter n°6
"Characteristics Techniques").
B) Upset the pump setting it on a table, press the "Start" button in alternate way.
C) During the working phase spill a little quantity of oil in the aspiration filter till the hose
stiffen itself.
D) Put the body of pump in the tank dipping it in the oil.
E) Verify if there is the re-prime, working for the activation of the employment.
F) If the pump is not activated repeat the operation described in the point B.
10. MAINTENANCE
We suggest to follow the operations of maintenance only after having read with attention this
handbook and learned with the practical use.
The operations described following are the only ones that the users are authorized to follow:
Any other intervention on the pump or parts of that it is considered as a tampering and it will
involve the automatic decadence of guarantee.
Every reparation of maintenance must be done with the cylinder completely re-entered and
after having disconnected the air feeding.
10.1 CHECK OF HYDRAULIC CONNECTIONS.
At least every 10 days verify the hydraulic and pneumatic connections. The check must be
effected both on the links, to verify that is not loosened and that they have not damages, that on
the pipings, to verify that they have not cuts or cracks.
10.2 CHECK OF THE OIL AND COMPLETE SUBSTITUTION.
At least every 10 days check the oil level with a special rod If necessary to fill up the oil using
the recommended brands or equivalent hydraulic oil. The operation of level oil check or periodic
integral substitution must be effected with the cylinder of the employment completely re-
entered. The integral substitution is recommended at least every two months of job, in
relationship to the frequency of pump employment and the height of environmental
16