Herunterladen Inhalt Inhalt Diese Seite drucken

Product Overview; Initial Commissioning - Klarstein Aquavita Chalet Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

EN
12

PRODUCT OVERVIEW

A
Lid Cover
B
Filer
C
Body
D
Base
E
Power Indicator Light
F
On/Off Switch
G Handle
H
Thermometer

INITIAL COMMISSIONING

Boil 2x clear water before the first use:
1. Fill the jug.
2. Place the jug on the base station.
3. Set the power connection
4. Switch on the device. This will switch on the operation led.
5. The boiler switches off automatically after use.
Note: Do not open the lid during pouring. Do not overfill the boiler with water. In this
case the water will boil over.

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis