Herunterladen Inhalt Inhalt Diese Seite drucken

Installation Options; Connecting A Load Shedding Relay; Water Installation On Finished Walls; Electrical Connection On Finished Walls - AEG DDLE Basis 11 Bedienung Und Installation

Elektronisch geregelter komfort-durchlauferhitzer
Vorschau ausblenden Andere Handbücher für DDLE Basis 11:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

10.2 Installation options

10.2.1 Electrical connection from below on
unfinished walls
» Fit the cable grommet.
Material losses
!
If you break out the wrong knock-out by mistake, use
a new back panel.
» Break out the cable grommet knock-out in the back
panel. Deburr sharp edges with a file if necessary.
» Reposition the mains terminal in the appliance from
the top to the bottom.
» Push the back panel over the threaded stud and the
cable grommet. Pull the cable grommet by the lock-
ing hooks into the back panel using pliers, until both
locking hooks audibly click into place.
» Push the back panel firmly against the wall. Lock the
fixing toggle by turning it 90° clockwise.

10.2.2 Electrical connection on finished walls

Note
This type of connection changes the IP rating of the
appliance.
» Change the type plate. Cross out "IP 25" and
mark the box "IP 24". Use a ballpoint pen to do
this.
Material losses
!
If you break open the wrong knock-out in the back
panel by mistake, you must use a new back panel.
» Cleanly cut or break out the required opening in the
appliance back panel (see chapter "Installation /
Specification / Dimensions and connections"). De-
burr sharp edges with a file if necessary.
» Route the power cable through the cable grommet
and connect it to the mains terminal.

10.2.3 Connecting a load shedding relay

10.2.4 Undersink installation, water connections –

10.2.5 Water installation on finished walls

1
L1 í
2
Install a load shedding relay in the distribution board in
conjunction with other electric appliances, e.g. electric
storage heaters. The relay responds when the instanta-
neous water heater starts.
Material losses
!
Connect the phase that switches the load shedding
relay to the indicated terminal of the mains terminal
in the appliance (see chapter "Installation / Specifi-
cation / Wiring diagram").
from above
An undersink installation with water connections from
above can be achieved with an additional pipe assembly
for undersink appliances. Cleanly break out the water pipe
knock-outs in the back panel and fit the pipe assembly.
Note
This type of connection changes the IP rating of the
appliance.
» Change the type plate. Cross out "IP 25" and
mark the box "IP 24". Use a ballpoint pen to do
this.
» Fit the water plugs with gaskets in order to seal the
connection for unfinished walls.
» Fit a suitable pressure tap.
» Click the lower section of the back panel into place in
the upper section of the back panel.
» Secure the connection pipes to the appliance.
» Secure the back panel at the bottom with two addi-
tional screws.
Material losses
!
If you break out the wrong knock-out by mistake, use
a new back panel.
» Cleanly break out the knock-outs in the appliance
cover. Deburr sharp edges with a file if necessary.
Installation
25

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis