Installation

Undersink installation
1 Cold water inlet
2 DHW outlet
Oversink installation
2
1 Cold water inlet
2 DHW outlet
Note
» Mount the appliance on the wall. The wall must
have sufficient load bearing capacity.

9.2 Water installation

◦ No safety valve is required.
» Flush the water line thoroughly.
» Ensure that the flow rate required to switch on the
appliance is achieved (see chapter "Installation /
Specification / Data table", On). If the flow rate is not
achieved, remove the flow limiter (see chapter "In-
stallation / Installation, Removing the flow limiter").
» If the required flow rate is not achieved when the
draw-off valve is fully opened, increase the water line
pressure.
Taps
Use appropriate pressure taps. Open vented taps are not
permissible.
Note
Never use the shut-off valve in the cold water inlet to
reduce the flow rate. The shut-off valve is intended
to shut off the appliance.
Permissible water line materials
◦ Cold water inlet line:
Pipes made from galvanised steel, stainless steel,
copper or plastic
◦ DHW outlet line:
Pipes made from stainless steel, copper or plastic
Material losses
!
If plastic pipework is used, take into account the
maximum inlet temperature and the maximum per-
missible pressure (see chapter "Installation / Spec-
ification / Data table").
22
1
2
1
Flexible water connection lines
» If the appliance is installed with flexible water con-
nection lines, ensure that the bayonet fittings of
the pipe bends do not become twisted inside the
appliance.
» Secure the back panel at the bottom with two addi-
tional screws.
10. Installation

10.1 Standard installation

◦ Electrical connection from above; installation on un-
finished walls
◦ Water connection on unfinished walls
◦ DDLE Basis 18/21/24: Connected load 21 kW preset
For further installation options, see chapter "Installation /
Installation / Installation options":
◦ Electrical connection from below on unfinished walls
◦ Electrical connection on finished walls
◦ Connecting a load shedding relay
◦ Undersink installation, water connections from above
◦ Water installation on finished walls
◦ Operation with preheated water
◦ Temperature limit
Opening the appliance
» Open the appliance by releasing the snap lock.
» Remove the back panel by pressing the two locking
tabs and pulling the lower section of the back panel
forwards.
Preparing the power cable
160
≥ 30