INSTALLATIoN

Installation
11. Installation

11.1 Siting

1 Transport tube (on the installation side)
2 Transport aids
3 Appliance foot
4 Sliding block
f Undo the four screws from the non-returnable pallet.
f
f Remove the washers.
f
f Remove the appliance feet from the pack.
f
f Tilt the appliance and wind in the appliance feet.
f
f Lift the appliance off the pallet.
f
f You may need to use the sliding blocks provided to help you
f
position the appliance.
f Observe minimum clearances (see chapter "Preparations /
f
Minimum clearances").
f Remove the transport aids.
f
f Level the appliance horizontally using its adjustable feet.
f

11.2 Opening the appliance

f Undo the fixing screws on the top appliance door.
f
f Open the top appliance door.
f
www.stiebel-eltron.com
1
2
f Undo and remove the fixing screws from the lower appliance
f
door.
f Remove the lower appliance door.
f

11.3 Hydraulic connection

Material losses
!
Carry out all water connection and installation work in
accordance with regulations.
3
Material losses
!
The heating system to which the appliance is connected
4
must be installed by a qualified contractor in accordance
with the water installation drawings that are part of the
technical guides.
Material losses
!
When fitting additional shut-off valves, install a further
safety valve in an accessible location on the heat gen-
erator itself or in the flow line in close proximity to the
heat generator.
There must be no shut-off valve between the heat gen-
erator and the safety valve.
f Install the DHW outlet line and the cold water supply line
f
(see chapter "Specification / Dimensions and connections").
f Please note that, depending on the supply pressure, you may
f
also need a pressure reducing valve.
f Debris (e.g. welding pearls, rust, sand, sealant, etc.) can im-
f
pair the operational reliability of the heat pump.
Thoroughly flush the pipework before connecting the heat
pump.
f Ensure the heating flow and return are connected correctly
f
(see chapter "Specification / Dimensions and connections").
f Provide thermal insulation in accordance with applicable
f
regulations.
Oxygen diffusion
Material losses
!
Do not use open vented heating systems. Use oxygen
diffusion-proof pipes in underfloor heating systems with
plastic pipework.
In underfloor heating systems with plastic pipes that are per-
meable to oxygen and in open vented heating systems, oxygen
diffusion may lead to corrosion on the steel components of the
heating system (e.g. on the indirect coil of the DHW cylinder, on
buffer cylinders, steel radiators or steel pipes).