Herunterladen Inhalt Inhalt Diese Seite drucken

User Instructions; Installation Instructions; Routine Maintenance - Cardin Elettronica EL series Installationsanleitung

Elektromechanische schranke für 3 m, 4 m und 6 m balken
Vorschau ausblenden Andere Handbücher für EL series:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 24

USER INSTRUCTIONS

Attention! Only for EU customers - WEEE marking.
This symbol indicates that once the products life-span has expired
it must be disposed of separately from other rubbish. The user
is therefore obliged to either take the product to a suitable dif-
ferential collection site for electronic and electrical goods or to
send it back to the manufacturer if the intention is to replace it
with a new equivalent version of the same product.
Suitable differential collection, environmental friendly treatment and disposal
contributes to avoiding negative effects on the ambient and consequently
health as well as favouring the recycling of materials.
Illicitly disposing of this product by the owner is punishable by law and will
be dealt with according to the laws and standards of the individual member
nation.
During the opening/closing manoeuvre check for correct operation
and activate the emergency stop button in case of danger.
During blackouts the boom can be released and manually manoeu-
vred (see manual manoeuvre pag. 19).
Have the appliance controlled and checked at regular intervals by
specialised maintenance personnel:
- Check to be carried out after the first 150.000 manoeuvres
(or six months after the installation);
- Routine maintenance to be carried out after 500.000 manoeu-
vres (and repeated every 500.000 manoeuvres);
- Complete revision after 1.000.000 manoeuvres.
In case of failure or operational anomalies switch off the power at
the mains do not attempt to repair the appliance yourself. Periodi-
cally check the correct operation of all safety devices (photoelectric
cells etc.). Eventual repair work or maintenance must be carried
out by specialised personnel using original spare parts.
The appliance is not suitable for continuous operation (see techni-
cal data on page 32).

ROUTINE MAINTENANCE

To be carried out by the installer.
A programmed control of the moving parts should be carried at
varying intervals after the installation.
1) Checks to be carried out (every 6 - 8 months):
- check the correct alignment of the boom
(if necessary have it re-aligned);
- check the boom travel limit switches "A1", fig.11, pag.9
(if necessary have them adjusted);
- check the adjustable boom alignment rod fig.10a/10b pag.9;
- lubricate the moving parts "L", fig.8, pag.8;
- check that the counter weight springs are correctly balanced.
2) After every 500.000 manoeuvres carry out a revision of the
automation as follows:
- check that the boom is correctly fastened to the boom
holder;
- replace the safety pin "F1", fig.13, pag.10;
- replace the opening direction anti-vibration rubber "E1", fig.12,
pag.9;
- check the efficiency of the travel limit switches "A1", fig.11,
pag.9;
- check the efficiency of the safety microswitches on the inspec-
tion doors "V", fig.8, pag.8;
- lubricate all moving parts;
- check that the barrier is securely fastened to the ground;
- check and control the electronic programmer.
3) After every 1.000.000 manoeuvres carry out a complete revision
of the system as follows:
- close the boom and disconnect it from the system;
- unscrew the screws fastening the motor holding plate to the
cabinet and remove it;
- check that the screws fastening the motor to the holding plate
are well fastened and if necessary tighten them down;
- check the integrity and the efficiency of the articulated eyeholes
"W", fig.10;
- replace the closing direction anti-vibration rubber.
- lubricate all moving parts.
• For installations that use the articulated boom, lubricate points
10. 17 and 24 (fig. 4, page 5) every 200.000 manoeuvres.

INSTALLATION INSTRUCTIONS

The minimum controls which may be installed are OPEN-STOP-
CLOSE, these controls must be installed in a location not acces-
sible to children.
• The ground must be stable enough to firmly hold the plinth and
the anchor plates.
• Where possible protect the barrier cabinet from accidental
knocks by passing vehicles.
• Work out the run of the cables according to the command and
control devices fitted and make sure the system conforms to
the local standard and regulations in force (see installation
example fig.1 pag. 2).
It is very important that the barrier be well fixed to the
fastening base as the ground anchors could loosen
throughout time due to movement and vibration and
cause damage to the cabinet.
FITTING THE UNIT (fig. 2a, 2b, 2c)
The appliances may be fitted both to the right and to the left of
the passageway.
- prepare a cement base with the base plate and anchors "A"
embedded.
The cable passage pipe "B" and the four threaded bolts M12
must protrude (30 mm) from the base plate.
- the base plate must be perfectly in square, its surface must be
clean and the four threaded bolts must emerge perpendicu-
larly.
Note: the cement base should preferably protrude 50 mm out of
the ground in order to avoid water build up which could damage
the appliance.
- remove the 4 self locking nuts "D" from the four threaded bolts
(used to fasten down the anchors) and insert the base of the
barrier "C".
Fasten down the barrier using the 4 self-locking nuts "D" and
washers supplied with the appliance.
- it is also possible to fasten the barrier to an already existing
cement base as long as the thickness of the base is great
enough to guarantee a strong hold for the rawlplugs.
We advise you to use the following type of rawlplug: "Steel anchor
bolts M12/Ø20 for heavy duty use".
OPENING THE ACCESS DOOR/FLIP-BACK HOOD (fig. 8)
Use the supplied key to open the access door or the flip-back
hood. Opening the access door forces the passive safety micro-
switches at positions "U" and "V" to cut in (the microswitches
cut off the power to the electronic components as well as the
appliance).
You are however always advised to shut off the power at the mains
before accessing the internal components.
ASSEMBLING THE STANDARD BOOM EL313C - EL413C
(fig. 3a, pag. 4)
• The boom is supplied already assembled and is fitted with a
25 mm rubber profile.
• Remove the two screws "D" and "E" from the boom holder "B".
Extract the upper plate "C" and insert it (without removing the
end cap) into the groove in the aluminium profile in lower part
of the boom "A".
Insert the boom "A" into the boom holder "B" and replace the
screws "D" and "E".
Adjust the boom balancing spring as indicated in the paragraph
"Balancing the boom" on pag 19.
ASSEMBLING THE 6-METER BOOM EL613 (fig. 3b, pag. 4)
• The boom is supplied already assembled and is fitted with a
25 mm rubber profile.
• Insert the free end of the boom "3" into the boom holder "2"
making sure that the plate "4" slides into the T-shaped groove
in lower part of the boom.
To insert the plate loosen the two screws "F" by three or four
turns then keeping the screws pressed upwards insert the
boom. Tighten the screws and adjust the boom balancing spring
as indicated in the paragraph "Balancing the boom" on pag
19.
17

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis