Herunterladen Inhalt Inhalt Diese Seite drucken

Section 3-Checklist And Cylinder Inspection; Compressor Operation Checklist; Cylinder Prefill Inspection - Invacare HomeFill II IOH200AW Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für HomeFill II IOH200AW:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 119
SECTION 3—CHECKLIST AND CYLINDER INSPECTION
SECTION 3—CHECKLIST AND
CYLINDER INSPECTION

Compressor Operation Checklist

Complete the following checklist each time the HomeFill II
Compressor is used to fill a cylinder:
❑ Ensure that the concentrator has been On for at least thirty
minutes. Refer to the concentrator Owner's Manual.
❑ Conduct the prefill inspection on the cylinder.
❑ Connect the cylinder to the compressor.
❑ Push the compressor power switch to the On ( ) position.
❑ Examine the indicator lights on the control panel.
❑ Disconnect and remove the full cylinder.
❑ Push the compressor power switch to the Off (O) position.
❑ Repeat this checklist when filling another cylinder.

Cylinder Prefill Inspection

WARNING
ONLY use cylinders that have the Invacare HomeFill II
connection and label.
All cylinders MUST be inspected before attempting to fill.
Otherwise, injury or damage may occur.
NOTE: For this procedure, refer to FIGURE 3.1 on page 20.
Part No 1145804
19
HomeFill
II Compressor
®

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis