a
3
4
2
1
11
10
15
13
12
14
Figure 3 Outline Drawing and Principal Items
SH-112 Dry Scroll Vacuum Pump
7
6
5
8
9
1. Front Cowling Screws; M8 (3)
2. Front Cowling
3. Inlet (NW25)
4. Inlet Screen
5. Exhaust Adapter NW16
6. Gas Ballast Port (1/8" National Pipe Thread)
7. Frame
8. Base
9. Mounting Slots; (4) for 1/4" or M6 Hardware
10. Rear Cowling
11. Rear Cowling Screws: M5 (3)
12. On/Off Switch
13. Fuse Holder and Voltage Changeover Tab
14. Power Connection (IEC-320)
15. Hour Meter
Unpacking and Inspection
1. Orient the shipping container with "This End Up"
on top.
2. Open the box and carefully lift the SH-112 out of the
box.
3. Save the carton and all packing materials.
4. Inspect the pump for damage. If there is shipping
damage, contact the freight carrier and your local
Agilent sales office immediately.
17