Herunterladen Inhalt Inhalt Diese Seite drucken

Unpacking And Inspection; Outline Drawing And Principal Items - Agilent Technologies SH-112 Bedienungshandbuch

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 13
a
3
4
2
1
11
10
15
13
12
14
Figure 3 Outline Drawing and Principal Items
SH-112 Dry Scroll Vacuum Pump
7
6
5
8
9
1. Front Cowling Screws; M8 (3)
2. Front Cowling
3. Inlet (NW25)
4. Inlet Screen
5. Exhaust Adapter NW16
6. Gas Ballast Port (1/8" National Pipe Thread)
7. Frame
8. Base
9. Mounting Slots; (4) for 1/4" or M6 Hardware
10. Rear Cowling
11. Rear Cowling Screws: M5 (3)
12. On/Off Switch
13. Fuse Holder and Voltage Changeover Tab
14. Power Connection (IEC-320)
15. Hour Meter

Unpacking and Inspection

1. Orient the shipping container with "This End Up"
on top.
2. Open the box and carefully lift the SH-112 out of the
box.
3. Save the carton and all packing materials.
4. Inspect the pump for damage. If there is shipping
damage, contact the freight carrier and your local
Agilent sales office immediately.
17

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis