Herunterladen Inhalt Inhalt Diese Seite drucken

W Orking Instructions; Service & Maintenance; P Reventive Maintenance - SUHNER ABRASIVE UBC 10-R Betriebsanleitung

Vorschau ausblenden Andere Handbücher für UBC 10-R:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 14
Dismantling the belt grinding attachment according to
Sec. 3.3.2.
Optimize the grinding belt tension with hexagon spanner
and mount the belt grinding attachment again.
Let the tool run without load for at least thirty seconds.
3.3.2 r
/
eplAcing
connecting the Belt grinding AttAchment
Attach the belt grinding attachment to the drive at the po-
sition you want, and tighten the screw.
3.3.3 r
/
eplAcing
connecting the contAct Arm
Loosen the knurled nut. Replace the contact arm, and
retighten the knurled nut.
26
3.3.4 r
/
eplAcing
connection the contAct roller
3.4 w
orKing instructions
The optimal grinding results are obtained when the grind-
ing belt is steadily moved back and forth under slight
pressure. The control electronics keep the belt speed
virtually constant during idle and load conditions for as-
sured, consistent work results. Too great a pressure re-
duces machine efficiency and the grinding belt's useful
life. The machine is equipped with an electronic control
and integrated overload protection. If the machine is over-
loaded the belt blocks briefly. Immediately remove all
loads on the machine and keep it running in the unloaded
state for a short time. Select a suitable belt speed.
When the contact pressure is too low the belt may
slip on the drive roller!
4. S
ervIce
4.1 p
reVentiVe mAintenAnce
To work effectively and surely keep the
machine and the ventilation slots clean at
all times.
After approx. 150 operating hours check carbon brushes
and replace if necessary. Clean motor housing and re-
plenish grease filling in gearbox housing.
To maintain the protective insulation the machine must be
subjected to a technical safety inspection. This work must
be done exclusively by a specialized electrical workshop.
When working on metal under extreme working conditions
conductive dust deposits can occur inside the machine,
/ m
aIntenance

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Utc 9-rUbc 9-r

Inhaltsverzeichnis