Herunterladen Inhalt Inhalt Diese Seite drucken

SELVA MARINE Goldfish 4 Wartungsanleitung Seite 268

Inhaltsverzeichnis

Werbung

BRKT
UPPER CASE ASS'Y
EXPLODED DIAGRAM
2
12
9
9
M6 x 10 mm
7
1st 3 Nm (0.3 m•kg, 2.17 ft•lb)
8
2nd 8 Nm (0.8 m•kg, 5.8 ft•lb)
REMOVAL AND INSTALLATION CHART
Step
Procedure/Part name
UPPER CASE ASS'Y REMOVAL
Power unit
Lower unit
Steering handle
Screw (shift lever)
1
2
Shift lever ass'y
3
Bolt (shift shaft)
Shift rod ass'y
4
5
Water tube
6
Steering friction screw ass'y
7
Bolt (tilt lock plate)
8
Tilt lock plate
UPPER CASE ASS'Y
1
14
13
17
15
16
M6 x 35 mm
1st 3 Nm (0.3 m•kg, 2.17 ft•lb)
2nd 8 Nm (0.8 m•kg, 5.8 ft•lb)
5
10
18
4.5 Nm (0.45 m•kg, 3.25 ft•lb)
M6 x 25 mm
Q'ty
Follow the left "Step" for removal.
Refer to "POWER UNIT" section in Chapter 5.
Refer to "LOWER UNIT" section in Chapter 6.
Refer to "STEERING HANDLE" section.
1
1
1
1
1
1
2
1
7-7
10
11
6
10
3
Service points
E
4

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis