Now set the manual/0/automatic switch to "Automatic" and do a trial run. To do this, the collection
chamber is filled through the normal inflow (washbasin, toilet, etc.). The system has to switch on
automatically, pump the chamber empty and switch on again. After switch-off, no water may run back
into the chamber from the pressure main.
Correct the follow-up time according to installation conditions and conveying height so that the pump
evacuates the collection chamber to a maximum and only runs dry for a short time (loud noise when
pumping). The back-flow pipe may no longer be immersed into the liquid after the pumping process is
finished. The follow-up time can be changed by means of the digital potentiometer on the switch device.
During the trial run, recheck all connections and fittings for leakage and re-seal where necessary.
If the lifting unit is running properly, the switch remains in the "Automatic" setting.
7. MAINTENANCE / REPAIRS

7.1 Inspection and maintenance intervals

Inspection and maintenance intervals according to DIN 1986 (German standard) Part 31: "Effluent
lifting installations should be checked once a month by the customer by monitoring one switching cycle
for operational capability and leakage...The system is to be serviced by a specialist. Inspection and
maintenance intervals should be no longer than :
- 3 months for systems in commercial operations
- 6 months for systems in multiple family residences
- 1 year for systems in single family houses"

7.2 Maintenance work

Disconnect the lifting station from the mains electricity before you
do any work to the system !
7.2.1 Collection chambers
Open the inspection lid and spray out the chamber with a hose to remove dirt layers on the chamber
walls.
7.2.2 Back-kick flap
Open the inspection lid and clean the back-kick flap from within.
7.2.3 Other
All other maintenance work has to be carried out by the customer service department.

8. MALFUNCTIONS, CAUSES AND TROUBLESHOOTING

Disconnect the lifting station from the mains electricity before you
do any work to the system !
10

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Sanicubic 2 gr

Inhaltsverzeichnis