Herunterladen Inhalt Inhalt Diese Seite drucken

Burner Start-Up Cycle; Maintenance - Riello BGK0.1 Montage- Und Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für BGK0.1:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

4.6

BURNER START-UP CYCLE

Normal
Thermostat
Heating
Motor
Ignition transformer
Valve
Flame
Lock-out lamp
0
B
Lock out is indicated by a lamp on the control box (3, fig. 1, page 1).
5.

MAINTENANCE

The burner requires periodic maintenance carried out by a qualified and authorised technician in conformity
with legislation and local standards.
Maintenance is essential for the reliability of the burner, avoiding the excessive consumption of fuel and
consequent pollution.
Before carrying out any cleaning or control always first switch off the electrical supply to the
burner acting on the main switch of the system.
THE BASIC CHECKS ARE:
Check that there are not obstructions or dents in the supply or return oil pipes.
Clean the filter in the oil suction line and in the pump.
Clean the
photoresistance,
Check for correct fuel consumption.
Replace the nozzle (see fig. 12, page 6) and check the correct position of electrodes (fig. 15, page 7).
Clean the combustion head in the fuel exit area, on the diffuser disc and the extremities of the fibre optic
(1, fig. 15, page 7).
Leave the burner working without interruptions for 10 min. and set rightly all the components stated in
this manual. Then carry out a combustion check verifying:
Smoke temperature at the chimney;
Smoke value according to opacity smokes index according to Bacharach scale.
~
150s
12s
(7, fig. 1, page 1).
Lock-out due to failure to light
0
Content of CO
;
Content of CO and NOx;
2
8
GB
~
150s
12s
5s
B
D5023
2694

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis