Herunterladen Inhalt Inhalt Diese Seite drucken

Assembly And Installation; Selection Of Vacuum Lines - Grundfos Vaccuperm VGB-103 Montage- Und Betriebsanleitung

Vorschau ausblenden Andere Handbücher für Vaccuperm VGB-103:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 36

5. Assembly and installation

5.1 Selection of vacuum lines

Warning
Observe section
1. Safety
The vacuum needed for the transport of chlorine gas is built up by
the injector, and maintained by the vacuum lines. Rigid PVC
pipes or flexible PE hoses are used as vacuum lines.
The following tables show the recommended diameter of vacuum
lines, depending on the line length and dosing quantity.
5.1.1 Vacuum lines between vacuum regulator and dosing regulator
Max. length [m] of the vacuum lines between
vacuum regulator and dosing regulator*
0
10
20
30
40
50
75
100
* For the calculation, a pressure loss of p = 12.5 mbar in the vacuum line was assumed.
5.1.2 Vacuum lines between dosing regulator and injector
Max. length [m] of the vacuum lines between
dosing regulator and injector**
0
10
20
30
40
50
75
100
** For the calculation, a pressure loss of p = 50 mbar in the vacuum line was assumed.
instructions.
40
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
40
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
Dosing quantity [g/h]
100
250
500
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
Dosing quantity [g/h]
100
250
500
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
1000
2000
4000
DN 8
DN 8
DN 10
DN 8
DN 8
DN 10
DN 8
DN 10
DN 15
DN 8
DN 10
DN 15
DN 8
DN 15
DN 15
DN 10
DN 15
DN 15
DN 10
DN 15
DN 15
DN 10
DN 15
DN 20
1000
2000
4000
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 8
DN 10
DN 8
DN 8
DN 10
DN 8
DN 8
DN 10
DN 8
DN 10
DN 15
DN 8
DN 10
DN 15
DN 8
DN 10
DN 15
13

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Vgb-103

Inhaltsverzeichnis