Ceiling opening and installation of hanging bolts
• Evaluate and determine the piping and wiring requirements inside the ceiling prior to the hanging of the unit.
• After installation place of the indoor unit has been determined, create opening in ceiling and install the hanging
bolts.
• For the ceiling opening size and pitch for hanging bolts refer to the dimensional drawing and the supplied
installation pattern.
• Once the ceiling void has been created, ensure that the drain pipe, refrigerant pipes, inter-connecting wires and all
control wires are in place prior to installing the actual indoor unit.
Please procure the hanging bolts and nuts for
installation of the indoor unit at local site.
How to use the supplied installation pattern
The installation pattern is enclosed within the packaging of the air conditioner.
Existing ceiling void
Use the pattern to determine the position and size of the opening and
location of the hanging bolts.
New ceiling void
Use the pattern to determine the position of the new ceiling opening.
Cut off slit section of the main unit of the installation pattern.
Cut off the outside of the pattern according to size of the ceiling
opening. (There is a slit on the standard opening size section.)
• Install the indoor unit after installation of the hanging bolts.
• Using the supplied pattern attach it to the indoor unit using the
supplied fixing screws (M5 × 16L 4 off). (Screw pattern to the
ceiling panel hanging brackets of the indoor unit)
• When creating the opening ensure it is as per the outer dimensions
of the supplied pattern.
Opening a ceiling and installation of hanging bolts
Treatment of ceiling
The ceiling differs according to the structure of the building. For details, consult your architect.
In the process after the ceiling panels have been removed, it is important to reinforce the ceiling construction and
ensure the ceiling remains in a horizontal position. This is to prevent possible vibration of the ceiling panels.
1. Cut and remove the ceiling material.
2. Reinforce the cut surface of the ceiling construction and add support for fixing the end of ceiling panel.
Installation of hanging bolt
Use M10 hanging bolts (4 off, locally procured).
When mounting the unit, set the pitch of the hanging bolts according to the size of the unit as detailed on the
dimensional drawing.
New concrete slab
Install the bolts with insert brackets or anchor
bolts.
(Blade type
(Slide type
(Pipe hanging
bracket)
bracket)
anchor bolt)
Steel flame structure
Use existing angles or install new
support angles.
Reinforcing
steel
Anchor bolt
Hanging bolt
8
Hanging bolt
M10 or W3/8
Nut
M10 or W3/8
Indoor unit
Installation pattern
(Attached)
M5 × 16L screws (Attached)
These screws are exclusive to the
installation pattern. When installing
the ceiling panel, the other exclusive
screws attached to the ceiling panel
(sold separately) are used.
Existing concrete slab
Use a hole-in anchors, hole-in
plugs, or a hole-in bolts.
Hanging bolt
Support angle
4 pieces
12 pieces
Cut off the installation
pattern along slit of
the main unit.