Herunterladen Inhalt Inhalt Diese Seite drucken

Stroke/End Position Setting - GEZE E 212 series Anschlussplan

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Stroke/end position setting

7
Stroke/end position setting
1
LED (green)
2
Setting screw stroke
The stroke is set to 52 mm in the factory.
Set and check the stroke according to fitting stroke
X
X
Setting value = Fitting stroke – 2 mm
Example OL90: Setting stroke 54 mm = Setting value drive 52 mm
When adjusting the limit switch make sure that it is switched off correctly
and the green LED on the drive has gone out.
The setting must be checked and safeguarded by means of a test run.
GB 10
E 212 R1 / E 212 R / E 212
-
+

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis