www.blaupunkt.com
A12
START-END OF SEASON OPERATIONS
START OF SEASON CHECKS
Make sure the power cable and plug are
undamaged and the earth system is efficient. Follow
the installation instructions precisely.
END OF SEASON OPERATIONS
To empty the internal circuit completely of water,
remove the cap (fig. 12). Run off all water left into a
basin. When all the water has been drained, put the
cap back in place. Clean the filter and dry thoroughly before putting back.
20