3  Initial Setup and Start
Selecting the correct grid code is important in order to
comply with the local and national standards.
It is possible to create customer-specific grid code files
with adjusted set values (see Section 3.2.4).
3.2.2 Switching on the DC
Load-Break Switch
Switching on the DC load-break switch at the same time
as the battery results in irreparable defects of the inverter
and will void the warranty.
• Ensure that the battery is switched off before
activating the load-break switch.
Figure 3.2. DC load-break switch
Switch on the DC load-break switch on the inverter.

3.2.3 Commissioning

The inverter starts up automatically. The battery is activated
.via the SMA Inverter Manager Commissioning takes a few
minutes. During this period, the inverter performs a self-test.
INFORMATION
The inverter is protected against short-term reverse
polarity. The inverter does not generate feed-in
power until any reverse polarity is corrected.
32
STPS60-IA-xx-12
Prolonged reverse polarity leads to a failure of the inverter
and thus will void the warranty.
• Make sure that the cables are correctly connected to
the inverter.

3.2.4 Grid Code File

INFORMATION
If the desired grid code is not available, or if the LCS
tool displays a warning about incompatible software
versions, the grid code and software library must be
updated on the LCS tool.
It is possible to create customer-specific grid code
files with adjusted set values. For this purpose, please
contact SMA Technology AG.

3.2.5 Configuring the Fallback

If the communication between the inverter and the SMA
Inverter Manager is interrupted, the inverter switches to a
previously defined operating state (Fallback). The desired
operating state when communication is interrupted, can be
activated and configured with the customer-specific grid
code file or via the LCS tool. For further information on the
configuration of the system fallback between the
SMA Inverter Manager and a superior control unit (e.g.
SCADA system or Power Plant Controller) see installation
manual of the SMA Inverter Manager / LCS Tool.
INFORMATION
Observe the specifications of your electric utility
company.