Herunterladen Inhalt Inhalt Diese Seite drucken

Yamaha YZ125LC Fahrer- Und Wartungshandbuch Seite 292

Vorschau ausblenden Andere Handbücher für YZ125LC:
Inhaltsverzeichnis

Werbung

KICK AXLE, SHIFT SHAFT AND PRIMARY DRIVE
GEAR
EC4C3000
REMOVAL POINTS
EC483111
Primary drive gear
1. Loosen:
9 Bolt (primary drive gear) 1
NOTE:
Place an aluminum plate a between the teeth of
the primary drive gear 2 and driven gear 3.
EC4B3101
Kick axle assembly
1. Remove:
9 Kick axle assembly 1
NOTE:
Unhook the torsion spring 2 from the hole a in
the crankcase.
EC4C3101
Shift guide and shift lever assembly
1. Remove:
9 Bolt (shift guide)
9 Shift guide 1
9 Shift lever assembly 2
NOTE:
The shift lever assembly is disassembled at the
same time as the shift guide.
EC4C4000
INSPECTION
EC4B4100
Kick axle and kick gear
1. Check:
9 Kick gear smooth movement
Unsmooth movement ¡ Replace.
2. Inspect:
9 Kick axle 1
Wear/Damage ¡ Replace.
EC4B4200
Kick gear and kick idle gear
1. Inspect:
9 Kick gear 1
9 Kick idle gear 2
9 Gear teeth a
Wear/Damage ¡ Replace.
4-40
ENG

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Yz125Yz125s

Inhaltsverzeichnis