Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 114

SEAS ONAL MAINTE NANCE

Consists in:
• Clean the stove internally and externally
• Carefully clean the heat exchange tubes
• Carefully clean and remove dirt from the combustion chamber and the relative compartment
• Clean fans, verify mechanical and clamp loosening
• Clean smoke channel (replace seals on smoke exhaust pipe)
• Clean smoke duct
• Check the expansion tank
• Check and clean the circulator
• Clean smoke extraction fan compartment.
• Clean smoke ow sensor.
• Clean smoke check thermocouple.
• Empty the pellet hopper and clean the base with the vacuum cleaner.
• Clean, inspect and scrape any residue from the ignition resistance compartment and if necessary, replace it
• Clean/check the Synoptic Panel
• Visually inspect the electrical wires, connections and power cable
• Clean the pellet hopper and check loosening of the feed screw - gear motor assembly
• Replace the door seal
• Functionality test: load the feed screw, ignite, let it run for 10 minutes and shutdown
If the boiler-stove is used very often, it is recommended to clean the smoke channel every 3 months.
After implementing a normal cleaning procedure, INCORRE CT coupling of the upper (A) ( gura E) and lower (B) ( gu-
ra E) combustion chambers can compromise the boiler-stove's performance.
Before igniting the boiler-stove, make sure the combustion chambers are correctly paired as indicated in ( g. F) without
ash or unburnt material present on the support perimeter.
We remind you that using the stove without cleaning the melting pot, may cause a sudden ignition gas inside the combu-
stion chamber with the consequent breaking of the glass
A
g. E
Cleaning the smoke duct
• When the thermo stove is off and cold, agitate the cleaning rod energetically (see previous page).
Remove the lower front cast iron panel (3 - g. C) and remove the steel inspection panel (4 - g. C/D), complete with silicone
gasket (5 - g. D), xed with wing nuts. Clean the silicone gasket and vacuum resid from the ue pipe (6 - g. D).
The thermo stove comes with a spare silicone gasket.
The amount of residue will depend on the type of fuel and system.
Failure to carry out this cleaning procedure may cause the boiler-stove to block.
ONCE THE PROCEDURE IS IMPLEMENTED, ENSURE THATTHE INSPECTION HATCH IS CLOSED PROPERLY.
g. C
3
MAINTENANCE
(implemented by the DEALER )
ATTENTION !!!
B
4
g. F
g. D
5
4
- 53
-
6

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

CameoStrassTresor

Inhaltsverzeichnis