Herunterladen Inhalt Inhalt Diese Seite drucken

Hauff-Technik MSH Basic-FUBO-E-SR4 Montageanweisung Seite 32

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

MSH Basic-FUBO-E-SR4 / MSH Basic-MBK-R4
Detail (see Fig.: 10)
► MSH Basic-FUBO-E-SR4 (basic unit) with mounted KES
hose systems (see Fig.: 11).
Place the MSH Basic-FUBO-E-SR4 (basic unit) with mount-
8
ed KES hose systems on the ground spike driven into the
ground (see Fig.: 12).
Then align the MSH Basic-FUBO-E-SR4 (basic unit) with
9
the unfi nished fl oor heightin terms of height and parallel
with the batter board.
When height adjustment is complete, fi x the wing screw
so as to fasten the construction (see Fig.: 13).
The installation fi xture is only for temporary fastening.
Only the immediate fi lling with sand up to the level
of the granular subbase ensures a fi xed positioning of
the base plate implementation.
32
Art. Nr.: 5090032065
Rev.: 03/2018-09-25
EN
Fig.: 10
Fig.: 11
Fig.: 12
Fig.: 13

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Msh basic-mbk-r4

Inhaltsverzeichnis