13 Assembly of MSH Basic-FUBO-SR4 (basic unit)

Position the pre-assembled water barrier fl ange on the
1
installation fi xture approx. 15 cm from the edge of the pipe.
Then snap the adjustable installation fi xture into place in
the basic unit (see Fig.: 2 and Fig.: 3)..
After this, fi t the MSH Basic-FUBO-E-SR4 (basic unit) and
2
installation fi xture together and fi x with the wing screw
(see Fig.: 4).
Longitudinally align the MSH Basic-FUBO-E-SR4 (basic unit)
3
with the installation fi xture based on the placement on
the batter board and position. Align the basic unit level
with the spirit level and insert into the ground (see Fig.: 5).
The precise height is not yet important.
Legend for Fig.: 5
1
Inner side of wall incl. plasterwork 5 cm
2
Level
IMPORTANT!
Failure to seal due to incorrect installation!!
Improper installation can result in damage.
• The MSH Basic-FUBO-E-SR4 must be arranged parallel to the wall.
• Minimum space between inside of wall (fi nished, plastered wall) to outer side of basic
unit: 5 cm.
• The basic unit must not be covered by the inner walls later (shell wall + plaster).
• When positioning the multiple-service building entry, care must be taken to ensure that
the installation fi xture does not hinder the empty conduit route (spiral hose KES).
• The position of the MSH Basic-FUBO-E-SR4 must be agreed upon with energy suppliers!
30
Art. Nr.: 5090032065
Rev.: 03/2018-09-25
EN
Fig.: 2
Fig.: 3
Fig.: 4
1
2
Fig.: 5