Herunterladen Inhalt Inhalt Diese Seite drucken

6�4 Storage; Disposal - Hauff-Technik MSH Basic-FUBO-E-SR4 Montageanweisung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

MSH Basic-FUBO-E-SR4 / MSH Basic-MBK-R4
The MSH Basic-MBK-R4 seal insert package includes:
1 x MSH Basic-MBK-R4 seal insert with 4 x sleeve pipes
8 x self-tapping screws 8x35 for sealing service lines
Necessary accessories:
Sealing elements for water, electricity, communication
Optional:
For use of gas building entries based on Test Specifi cation VP601 B1/Jan. 2008, suitable
for Gas HEK made by Schuck, for example, with rip-out protection, primary and secondary
sealing element.
1 x MIS SKD...DN25
or HS-SKD...DN32
or HS-SKD...DN40
6�4 Storage
NOTE!
Damage due to improper storage!
Signifi cant damage can occur in the event of improper storage.
• Protect the MSH Basic-FUBO-E-SR4/MSH Basic-MBK-R4 wall sleeve from damage,
• The MSH Basic-FUBO-E-SR4/MSH Basic-MBK-R4 wall sleeve must be stored in
7

Disposal

If no return or disposal agreement has been concluded, recycle dismantled components after
they have been properly dismantled:
• Dispose of elastomer segments according to existing environmental regulations.
• Dispose of plastics according to existing environmental regulations.
• Dispose of packaging material according to existing environmental regulations.
26
damp and soiling prior to installation. Only intact components may be installed.
such a way that it is not exposed to low temperatures (<5° C), high temperatures
(>30° C) or direct sunlight.
Art. Nr.: 5090032065
Rev.: 03/2018-09-25
EN

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Msh basic-mbk-r4

Inhaltsverzeichnis