Herunterladen Inhalt Inhalt Diese Seite drucken

Nibe PKM 10 Montageanweisung Seite 16

Vorschau ausblenden Andere Handbücher für PKM 10:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

GB
Electrical installation FIGHTER 1240
The enclosed cable harness is connected from the termi-
nal box (-X200) in the distribution box in PKM 10/20 to
the relay card (29) as follows:
The cables from the edge board connector are marked
"1" – "6" and should be connected to -X200 positions
1 – 6.
Edge board connector (-X1bA) is connected to -X1b po-
sitions 4 – 10 on the relay card (29).
The cable marked "8" is connected from -X200:5 to the
relay card position -X1c:30.
The cable marked "7" is connected from -X200:7 to the
relay card position -X1c:36.
The yellow/green cable is connected between the free
earth stud in the heat pump and the earth terminal in
the distribution box.
If PKM is to be installed with FLM 40, the enclosed relay
must be connected. See section entitled "Connection of
relay in FLM 40".
When PKM is installed on a FIGHTER 1240 with FLM
and pool heating, the edge board contact -X1bA must
be removed and the cables harness from PKM is con-
nected directly to position -X1b.
Cable marking:
14
"1"
"2" "3"
"4"
PKM
29
F-1235/40 3x400V
NOTE! The cable marked "4" is not used in this applica-
tion, but must still be connected as it is voltage fed.
F-1235/40 3x400V leveranskoppling
"8"
"5" "6"
"7"
PKM
32
8
1
F-1235/40 3x400V+tillbehörskort
LEK
F-1235/40 3x400V tariffkoppling

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Pkm 20

Inhaltsverzeichnis