GB
Pipe installation, outline diagram
The pipe installation is to be carried out according to
the diagram below. The enclosed T-joint is mounted as
shown in the picture under "Component positions" at
positions (A) and (B). The installation should be done so
that vibrations are not transferred from the heat pump
to the cooling module via the pipes and onward.
NK
AV
SÄV
KB-in
KB-ut
AV
Shutoff valve
BK/JK
Rock collector/Soil collector
EXP
Expansion vessel
FG
Flow sensor
KB-in
Brine in
KB-out
Brine out
NK
Level vessel
SV-K
Shunt valve
SÄV
Safety valve
VXV-K
Shuttle valve
VVB/ACK
Accumulator with hot water heater
12
VVB/ACK
FIGHTER 1240
E
C
I
VXV-K
G
H
AV
PKM
S Ä V
A
B
PKM
FG
SV-K
F
BK/JK
EXP