Herunterladen Inhalt Inhalt Diese Seite drucken

Remodelling For Second Room Connection; Remodelling For Toilet Extraction - Helios UltraSilence ELS-GU Montage- Und Betriebsvorschrift

Vorschau ausblenden Andere Handbücher für UltraSilence ELS-GU:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Installation and Operating Instructions
NOTE
ATTENTION
NOTE
Fan-casing-types ELS-GU
4.3

Remodelling for second room connection

- Accessory ELS-ZS or ELS-ZAS required.
Connect and seal connection duct Aluflex/Stealflex DN 80 airtight.
fig.13
Break opening for
discharge spigot in
the casing. On the
right or left.
4.4

4.4 Remodelling for toilet extraction

- Accessory ELS-WCS required.
For the toilet installation situation (fig. 18) the local regulations are to be considered! Commissioning without
filters is not allowed, since otherwise the equipment and the entire duct get dirty.
The air conditioning is to be realized by others! Connect and seal connection duct airtight.
fig.15
Break opening for
discharge spigot in
the casing. On the
right or left.
HINWEIS:
Eventuell ist die Verwendung der Einlegefolie
aus ELS-ZS zur Einregulierung der Luftmenge
sinnvoll (Rückfrage im Werk).
NOTE:
Optionally usage the plastic foil from second
room kit ELS-ZS for regulation the air volume
(call back in factory).
fig.14
ELS-GU.. Discharge to the top,
Connection for second room discharge
on the left
or right
ELS-ZAS
connect
discharge spigot
fig.16
fig.17
8
.
ELS-WCS Toilet extraction kid
DN 50
DN 40
DN 30
˜

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis