Laying of Natural Stone:
(marble, granite, agglomerated marble)
Grounding of slab p. e using PCI ground
varnish 303. For laying of the slabs use p.
e. PCI-Carrament.
Laying of the slab, p. e. using PCI-Carra-
ment (special Natural Stone silicion) area of
application analogue to 1.
2.3 Connections
a) off-set inlet-connection
Fully equipped connection socket according
to DIN 100 available. The inlet-piping must
be installed allowing a minimum of 2 % fal-
ling gradient.
Attention: Do not drill the vessel.
Improper drilling may cause da-
mage of the inner vessel which may
cause leakiness of the pumping equip-
ment.
b) drainage connection
The installation of the drainage connection is
only possible after installation of pump accor-
ding to the instruction in point 2.4. The connec-
2. Installation
tion of the drainage function to the sump is exe-
cuted through the attached drainage connec-
tion. Insert the drainage connection into the
pre-setted wall chase and lock it with the
single-hand quick-release fastener.
Using a stormwater tight cover plate (auxiliary
equipment) the wall chase must be closed
using the provided sealing plug.
Depending on the inlet depth (mortise depth of
upper section) the drainage connection can be
trimmed to the particular length (see picture
No. 3).
c) pressure conncection
Pressure connection: 1 ½" male thread
The pressure pipe set (Article No. 28 040)
includes a 5 m pressure pipe tube DA 40
and an adapter with a pipe clamp. Alternati-
vely a pressure pipe diameter=40 mm mini-
mum 38 mm can be used for the PVC-ad-
hesive bond. The delivery pipe has to be
guided via the local defined backwater level
and connected to a ventilated ground-
collecting line.
3
d) cable conduit access
For installation of the electrical lines and if ne-
cessary of the air tube for the pressure sen-
sor a cable conduit on site must be provided
(see picture No. 4). The empty conduit can be
installed in the provided cable bushing which
is located in the connector. To avoid conden-
sation water the cable conduit must not be
sealed air-tight.