Herunterladen Inhalt Inhalt Diese Seite drucken

Carrying Out Measurements; Preparation Of Operation; Inserting The Batterie; General Information - Unitest 93411 Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5.0 Carrying out Measurements

5.1 Preparations prior to Operation
Insert the battery prior to operating the instrument. The ref-
erences described in paragraph 2.0 regarding the handling
of batteries must be followed.
5.1.1 Inserting the battery
" Unscrew the screw on the battery case cover (8).
" Remove the battery case cover (8).
" Connect the battery supplied to the plug by respecting
the correct polarity.
" Replace the battery case cover (8) and tighten the screw.
5.2 General
The measurements have to be carried out in compli-
ance with the respectively applicable standards.
For all tests (measurements) follow the safety references as
described in paragraph 2.0.
Direct the measurement microphone towards the
sound emitting source.
To minimise operator influence on the measurements
make sure that the sound level meter is placed at a dis-
tance of approx. 50 cm away from the body or mount-
ed onto a tripod. The operator body acts as a sound re-
flector and can lead to an error of measurement of up
to ± 6dB.
Carrying out Measurements
19

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis