Herunterladen Inhalt Inhalt Diese Seite drucken

Specifications; Standard Accessories; Prior To Operation - Hitachi H 65SB2 Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für H 65SB2:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 7
English
PRECAUTIONS ON USING DEMOLITION
HAMMER
1. Wear earplugs to protect your ears during operation.
2. Do not touch the bit during or immediately after
operation. The bit becomes very hot during operation
and could cause serious burns.
3. Before starting to break, chip or drill into a wall,
floor or ceiling, thoroughly confirm that such items
as electric cables or conduits are not buried inside.

SPECIFICATIONS

Voltage (by areas)*
Power Input
Full-load Impact Rate
Weight (without cord, side handle)
* Be sure to check the nameplate on product as it is subject to change by areas.

STANDARD ACCESSORIES

(1) Case ............................................................................ 1
(2) Bull Point ................................................................... 1
(3) Hexagon Bar Wrench (for 8 mm bolt) ................ 1
(4) Hexagon Bar Wrench (for 4 mm bolt) ................ 1
Standard accessories are subject to change without
notice.
OPTIONAL ACCESSORIES (sold separately)
Asphalt Cutting
(1) Cutter
Groove Digging and Edging
(1) Cold Chisel
Tamping
(2) Shank
(1) Rammer
Outer diameter: 200 mm
4
Overall Length: 410 mm
Width:
75 mm
Overall Length: 410 mm
Overall Length: 250 mm
4. Wear a mask when turning your head upward.
5. Properly set the bit holder
6. At the start of work, confirm screw tightening.
7. When working at a highly elevated location, pay
attention to articles and persons below.
8. Wear protective shoes to protect your feet.
(110V, 115V, 120V, 127V, 220V, 230V, 240V)
1340 W*
1400 min
16.5 kg
Scooping Work
Grease
500 g (in a can)
30 g (in a tube)
Optional accessories are subject to change without
notice.
APPLICATIONS
Demolishing concrete, chiseling off concrete, grooving,
bar cutting.
Application examples:
Installation of piping and wiring, sanitary facility
installation, machinery installation, water supply and
drainage work, interior jobs, harbor facilities and other
civil engineering works.

PRIOR TO OPERATION

1. Power source
Ensure that the power source to be utilized conforms
to the power requirements specified on the product
nameplate.
2. Power switch
Ensure that the power switch is in the OFF position.
If the plug is connected to a receptacle while the
power switch is in the ON position, the power tool
will start operating immediately, which could cause
a serious accident.
3. Extension cord
When the work area is removed from the power
source, use an extension cord of sufficient thickness
and rated capacity. The extension cord should be
kept as short as practicable.
–1
(1) Scoop
Overall Length: 410 mm

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis