Commissioning

6.2

Post-connection check

Is the device or cable undamaged (visual check)?
Do the cables comply with the requirements ?
Do the cables have adequate strain relief?
Are the cable glands mounted and firmly tightened?
Does the supply voltage match the specifications on the nameplate?
If supply voltage is present, is the green LED lit?
7
Commissioning
7.1

Function check

Before commissioning your measuring point, ensure that the post-installation and post-
connection checks have been performed.
• "Post-installation check" checklist →  32
• "Post-connection check" checklist →  36
7.2

Light signals (LEDs)

A
2
3
 12
Position of LEDs in housing cover
A
M12 connector, (cable without graphic)
B
Valve plug
Position LEDs
Green LED (gn)
1
lit
Yellow LED (ye)
2
lit
36
4
1
1
2
3
Description of function
Measuring device is operational.
M12 connector
Indicates the sensor state: Sensor is covered by liquid
B
3
2
2
3
Liquipoint FTW33
1
1
A0025773
Endress+Hauser