Herunterladen Diese Seite drucken

Important Notes; Installation - ABB IN/S 3.1 Montage- Und Bedienungsanleitung

Eib internet-gateway

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
Montageanleitung_v1_ABB_03-06-12.qxd

Important notes

Installation and assembly must be performed only by trained electri-
cians. The applicable standards, guidelines, regulations and legal
requirements must be observed when planning and setting up elec-
trical installations.
Risk reduction instructions:
Protect the EIB Internet-Gateway IN/S against moisture, dirt
and damage during transportation, storage and operation!
Do not exceed the stated technical data when operating the EIB
Internet-Gateway IN/S!
Make sure the EIB Internet-Gateway IN/S is adequately cooled at
all times!
Cleaning: Soiled devices can be cleaned with a dry cloth. If this is
not sufficient, a cloth slightly dampened with a soap solution may be
used. Never use caustic agents or solvents.
The device must not be repaired if damaged (e.g. during transporta-
tion or storage).

Installation

The EIB Internet-Gateway IN/S can be installed in distribution
boards or small housings for quick fastening on 35-mm mounting
rails as per EN 60715.
Connection: Electrical connection is via plug-in screw terminals.
Terminal designations are shown on an adhesive label on the hou-
sing.
23.06.2003
10:07
17
Seite 17

Werbung

loading

Diese Anleitung auch für:

In/s 4.1