Herunterladen Inhalt Inhalt Diese Seite drucken

Replacing The Fuse; Changing The Fuse - VOLTCRAFT R-200 Bedienungsanleitung

Milliohmmeter
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Proceed as follows to insert or change the batteries:
- Disconnect all measuring leads from the meter and switch
it off.
- Fold out the mounting bracket (8) and unscrew the four
screws securing the battery compartment (9).
- Remove the cover of the battery compartment from the
meter. The batteries can be accessed now.
- Replace all the batteries with new ones of the same type.
- Close and secure the battery compartment in reverse order.
- The meter is ready for use once again.
Never operate the meter when it is open. !RISK OF FATAL INJURY!
Do not leave flat batteries in the device. Even batteries protected against leaking can
corrode and thus release chemicals which may be detrimental to your health or
destroy the device.
Do not leave batteries lying around carelessly. They could be swallowed by children
or pets. If swallowed, consult a doctor immediately.
If the device is not used for longer periods of time, remove the batteries in order to
prevent leaking.
Leaking or damaged batteries may cause alkali burns if they come into contact with
the skin. It is therefore advisable to use suitable protective gloves.
Make sure that the batteries are not short-circuited. Do not throw batteries into
the fire.
Always replace all batteries at once. The use of new and discharged or old batteries
together affects the battery life. Always use batteries of the same type and from the
same manufacturer in a set of batteries. The batteries can be damaged by equalizing
currents and may leak.
Batteries must not be recharged or dismantled. There is danger of explosion.
You can order suitable alkaline batteries stating the following order no.:
Item no. 652509 (please order six).
Only use alkaline batteries, as they are powerful and have a long service life.

Replacing the Fuse

The current measuring ranges "µA/mA" and the 4 leads resistance measurement ranges (connections
"P1/P2") are secured with high performance fuses. If measuring in this range is no longer possible, you
have to change the fuse.
39

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis