Herunterladen Inhalt Inhalt Diese Seite drucken

Maintenance; Blocking The Elevating Assembly; Scissor Brace Installation; Scissor Brace Stowage - Upright MX 15/19 Betriebsanleitung

Vorschau ausblenden Andere Handbücher für MX 15/19:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

060570-027 MX 15/19
M
AINTENANCE
W A R N I N G
!
Never perform service while the platform is elevated without first blocking the elevating assembly.
DO NOT stand in the elevating assembly area while deploying or storing the brace.
B
L O C K I N G
A
S S E M B L Y
S
CISSOR
1. Park the work platform on a firm, level surface.
Completely unload the platform before install-
ing the Scissor Brace.
2. Verify that the Chassis and Platform Emer-
gency Stop Switches are ON by pulling each
button out.
3. Turn and hold the Chassis Key Switch to
CHASSIS. Push the Chassis Lift/Lower Switch
to UP and elevate the platform approximately
2,1 m (7 ft.).
4. Rotate the Scissor Brace to a vertical position.
5. Carefully lower the platform until the end of the
Scissor Arm Weldment rests on the Brace.
S
CISSOR
1. While holding the Brace, slowly raise the platform using the Chassis Controls until the end of the Scis-
sor Arm Weldment clears the Scissor Brace.
2. Rotate the Scissor Brace forward to rest on the Chassis.
3. Push the Chassis Lift/Lower Switch to LOWER and completely lower the platform.
Page 12
T
E
H E
L E V A T I N G
B
I
RACE
NSTALLATION
B
S
RACE
TOWAGE
!
Scissor Arm
Weldment
Brace Installed
Brace Stowed

Maintenance

Figure 8: Scissor Brace
Operation Manual

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Lift

Inhaltsverzeichnis