Herunterladen Inhalt Inhalt Diese Seite drucken

Programming Unit Standard; Adjusting The Ceiling Cover Plate - Kindermann Deckenlift compact2 80 Installationsanleitung

Vorschau ausblenden Andere Handbücher für Deckenlift compact2 80:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

4.5.1 Programming unit Standard

Install the unit according to the attached circuit diagram (paragraph 4.1). Make sure that the colours of the installation
cables are identical with the colours of the motor cable. Connect with the mains only after completing the installation!
Adjusting the stop positions:
1.
Press button E
for at least 6 seconds. The motor switches into adjustment mode.
2
A short stop after the start indicates the adjustment mode!
2.
Drive to the bottom end position (projection position) by pressing button
3.
Press button E
for at least 3 seconds, the bottom end position (projection position) is set.
2
4.
Drive carefully to top end position by pressing button
Attention: Do not let the lift crash against the ceiling construction!
5.
Press button E
for at least 3 seconds. Top end position (home position) is set.
2
6.
After adjusting the unit you should make a test drive. If the ceiling lift stops at the programmed end positions,
the programming has been carried out correctly.
Attention: During the programming the voltage is exclusively supplied via the mains plug of the programming unit.
There must not be any other electrical connection to the mains (danger of short circuit!).
1
Mains
Media controlled operation

4.6 Adjusting the ceiling cover plate

When the lift is in its upper position the cover plate should be level with the surface of the false ceiling. One method is to
fasten the screws of the extension elements on the cover plate only slightly, to adjust the upper stop position, to move the
lift upward into this position and to press the ceiling cover plate manually against the surface of the false ceiling. Afterwards
lower the lift again and tighten the screws. Also the screw
Operation signal
2
Programming unit
Standard 7466 000 100
È
.
1
Ç
(home position, the lift is up).
1
on the projector holder
b
must be secured with a spanner.
8
29

Werbung

Kapitel

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Deckenlift compact2 120

Inhaltsverzeichnis