Herunterladen Inhalt Inhalt Diese Seite drucken

Setup; Connection To The Mains - EuroLite Zeitgeist Fog 1200 Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

5

SETUP

2
1
Remove all packing materials from the shipping box. Make sure that there are no packing remnants at
the fog output nozzle.
2
Unscrew the tank cap and fill the tank with fog fluid. Tightly close the tank again.
The fluid tank needs to be filled with fog fluid before starting operation and always disconnected from
the mains as fluid could be spilled.
Only use quality fog fluids available at your dealer. We recommend high-quality EUROLITE fog fluids
(e. g. EUROLITE Smoke Fluid "P" professional, 5 l). You must not use substances that are classified
as "dangerous working material" or "inflammable fluids".
3
Connect the included remote control to the 6.3 mm jack REMOTE CONTROL. As the base of the
remote control is magnetic, you can attach it to the fog machine.

Connection to the Mains

Connect the device to the mains with the power plug.
The occupation of the connection cables is as follows:
Cable
Pin
Brown
Live
Blue
Neutral
Yellow/Green Earth
The earth has to be connected! If the device will be directly connected with the local power supply network, a
disconnection switch with a minimum opening of 3 mm at every pole has to be included in the permanent electrical
installation. The device must only be connected with an electric installation carried out in compliance with the IEC
standards. The electric installation must be equipped with a Residual Current Device (RCD) with a maximum fault current
of 30 mA.
www.eurolite.de
International
L
N
3
22

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

51701991

Inhaltsverzeichnis